Demonstration

Development and execution of a dissemination plan

A detailed planning for the dissemination of knowledge and results will be developed by WASTE, being the Dissemination manager, in close cooperation with the coordinator Centexbel and all other partners. These plans will be formulated in concrete terms and will contain the dissemination strategies for the three different targeted groups.

Requirements for a good dissemination plan include:

Development of a Mobile Recycling Kit (MRK)

In this subtask two kits will be developed:

  • Clearing kit (CK): to clear and collect debris construction material after a disaster.
  • Debris recuperation kit (DRK): this kit will be optimized for the use of the crushed material resulted from the breaking of demolition debris.


By combining these two kits, the aim it to be able to reuse 100% the debris, so that nothing is lost, and the demolished material becomes part of the new infrastructure. Requirements for the two kits are based on pre-studies and the guide lines are the following: